Installation of kitchen furniture in Benahavís
Furniture may be assembled while some equipment is yet to arrive. Their references must be known to prepare compatible openings and panels, keeping identified the settings that can only be checked with the appliance present. This distinction avoids interpreting an integrated front regulation as finished when the movement and fixation of the real model that will be received inside the kitchen of the home still needs to be verified.
Tell us about your kitchen
Choose the type of renovation and the approximate size. Then write to us or fill out the form.
Orderly assembly, from units to adjustment
- PartsReview of the furniture and assembly plan.
- StakingChecking dimensions and position of each unit.
- SupportsAssessment of walls and necessary fixings.
- InstallationAssembly and levelling of base, high and column furniture.
- OpeningsPlacement and adjustment of doors, drawers and hardware.
- AuctionsPlinths, panels and planned joints.
Kitchen furniture installation quote in Benahavís
Separate regulation and equipment assembly operation
Aligning furniture doors is not equivalent to fixing or connecting an appliance. Consult equipment installation to coordinate these actions with the conditions of the model. The scope must indicate who provides each part, what adjustments are expected after delivery and what data must be defined before manufacturing a panel or side whose dimension depends on the specific accommodation of the appliance chosen for the kitchen.
Maintain a final check of the assembly
The openings must be tested with neighbouring elements and finials in their intended position. On the quote page you can identify the phases linked to pending supplies to understand what each job includes. The organization must review availability and documentation, without assuming that a cabinet assembly automatically covers all the adaptations or connections that equipment that has not yet been received in the home may need to verify its final placement.
Quote and scope of work at Benahavís
With equipment pending delivery, panels may require further adjustment. The proposal distinguishes furniture regulations from the operations linked to installing each appliance in its space.





